Built on the QE2 reservoir, near London’s Heathrow Airport, this solar farm has a peak output of 6.3 megawatts and is expected to generate 5.8 million kilowatt hours in its first year – equivalent to the annual consumption of around 1,800 homes.
Due to the typical fast track nature of solar farms, ETS played a vital role during the construction phase by delivering relevant products, such as MV terminations on a same day basis helping to ensure that the project was completed in time and operational in March this year.
The energy generated by this farm will be used to power nearby water treatment plants operated by Thames Water who are aiming to self-generate a third of their own energy by 2020. The video is supplied courtesy of Lightsource Renewable Energy who delivered this ambitious project and were responsible for installation of 23,000 plus solar panels.
For further information, please contact: 020 8405 6789 or sales@etscablecomponents.com, or you can read more here.
ETS Cable Components are an official supplier, stockist and distributor of cable components for a range of Industries, including solar farms.